All six GB DNOs — MCS certified installers only
DNO/DESKEnquiry form

G98 and G99 DNO applications, submitted for you

Submission to commission

I submit G98 and G99 connection applications on behalf of solar PV and battery installers. You send the pack; I pick the right form, fill it in correctly, submit it, chase the DNO, pass back the export number and MPAN, and send the commissioning confirmation once you have energised the system.

You remain the designer of record. One fixed fee per application, listed below.

At a glance
Forms
G98, G99
Capacity range
Up to 500 kW
DNO coverage
All six GB DNOs
Designer of record
Stays with you
Fee covers
Submission to commission
Price from
£40

01  Pricing

Per application, based on total installed capacity. One fee covers submission through to commissioning. No VAT is charged on these prices — what you see is what you pay.

FormCapacityPrice
G98 notificationUp to 3.68 kW£40
G99 application4 – 15 kW£75
G99 application15 – 50 kW£195
G99 application50 – 500 kW£350

02  DNO coverage

All six GB distribution network operators, plus independent DNOs. Great Britain only — Northern Ireland is a separate regime and isn’t covered.

UK Power NetworksEast of England, London, South East England
National Grid Electricity DistributionMidlands, South West England, South Wales
Northern PowergridNorth East England, Yorkshire, northern Lincolnshire
SP Energy NetworksCentral and southern Scotland, Merseyside, Cheshire, North Wales
Scottish & Southern Electricity NetworksNorth Scotland, central southern England
Electricity North WestNorth West England

Independent DNOs (GTC, ESP, Last Mile and similar) are handled on the same basis — tell me the network and I’ll confirm.

Not sure which DNO covers a site? Check an MPAN — free, no sign-up.

03  Who I work with

Installers only, and only ones meeting the standards below. I don't work direct with homeowners.

MCS certifiedYour company holds current MCS certification for the technology being installed.
Consumer code memberHIES, RECC or equivalent, with an insurance-backed guarantee available to the end customer.
Letter of AuthoritySigned by the customer, authorising me to submit on their behalf. I provide the template; it takes them two minutes.

This isn't gatekeeping for its own sake. The application carries the customer's name and their MPAN, and it is the DNO's record of what is connected to their network. If the install behind it isn't certified and the customer has no recourse, that's a problem I'd rather not put my name to.

04  How it works

  1. STEP 1
    You send the pack. SLD, cutout photo and customer details. Upload them in the portal, or email them across.
  2. STEP 2
    I check it's complete and submit. Right form for the DNO, filled in correctly. If something is missing, I ask you before it goes in.
  3. STEP 3
    I track and chase. I hold the reference, answer DNO queries and keep the application moving.
  4. STEP 4
    You get the approval and export number. Decision, export number and MPAN passed back for your records and the customer's.
  5. STEP 5
    I submit the commissioning confirmation. Once the system is energised, the commissioning paperwork goes to the DNO. Included in the fee — the job isn't finished until this is done.

05  What you need to send me

Three items per site. Incomplete packs are the main cause of delay.

ItemWhat I need to seeFormat
Single line diagramPoint of connection, isolation, protection and metering position — and what is being installed: panel make and quantity, inverter make and model, battery make and model if fitted. Capacity is taken from the inverter model, so there's nothing to state separately.PDF
Cutout photoMain fuse rating legible; meter and supply arrangement in frame.JPG / PNG
Customer detailsName and installation address as shown on the electricity bill, with postcode, plus a phone number and email address. Site address too if it differs.Text

06  Scope and liability

You remain the designer of record for the installation.

I am responsible for the accuracy and completeness of the submission — the right form, filled in correctly, submitted, followed up, and the commissioning confirmation sent once you have energised the system.

I am not responsible for the system design, the specification, or the installation work.

If the information you send is wrong, the application will be wrong. I will flag anything that looks inconsistent before submitting.

The full position is in the terms of service. Worth two minutes before you instruct me.

07  Enquiry

Tell me the DNO area and the system size and I’ll confirm whether I can take it. Or email hello@dnodesk.co.uk.

Sending an enquiry doesn’t commit you to anything. If we work together, my terms of service apply.